Bathroom and Kitchen Remodel Plumbing in King County, WA
Lighthouse Plumbing does the plumbing for bathroom and kitchen remodels across King County: rough-in of new drains, vents and water lines while the walls are open, the inspection, and the trim-out once the tile and cabinets are in. We work for homeowners and alongside general contractors, and we pull the plumbing permit as part of the job.

A Master Bath Rough-In in Kirkland
In May, Noel roughed in a master bathroom in north Kirkland, between Juanita and Totem Lake, after the homeowner's crew had taken it to the studs. The new layout had a drop-in bathtub set into a framed deck under the window and a separate stand-alone shower with two control valves. The homeowner was supplying the tub valve and deck filler and both shower valves; our scope was the plumbing behind and under them.
On the first day Noel opened what still needed opening, ran new ABS drain lines through the floor, moved the shower drain to the new center of the shower and roughed in PEX hot and cold lines to the tub and shower. There was one question the drawings had not answered: which way the second shower valve should face. He went over the layout with the homeowner on site before running the pipe, rather than guessing and moving it later. He came back the next afternoon to connect the shower valves to the PEX, secure and insulate the lines, fit nail plates where the pipe passes close to the face of a stud, and put the system on test for the inspection.


The scope left the vanity sinks, the toilet, the shower pan, setting the tub and all the tile and drywall to others, and we said so in writing up front. That clarity is what keeps a remodel on schedule: everyone knows who brings what and when the plumber needs the room.
Our Recent Remodel Plumbing Work
The Kirkland master bath is one of several remodels we plumbed in 2026:
- Near downtown Kirkland, Mykal roughed in a bathroom that turned a tub into a shower. The old tub drain was 1-1/2 inches, too small for a shower, so he opened the subfloor from below, removed it and tied the new shower drain into the existing 2-inch line further downstream, then stubbed out a double vanity in PEX finished in copper.
- Also near downtown Kirkland, PJ and Alexander moved a kitchen sink from a peninsula to a new island: new PEX supply, new ABS drain and an air admittance valve in the island cabinet to vent it, the refrigerator water line moved into a recessed box, and the gas line moved a few feet to the new range.
- In Lake Hills, Bellevue, Caleb plumbed a bathroom in two phases around a wall-hung Toto toilet on an in-wall carrier with a Washlet seat, a vanity and a three-function shower valve, transitioning the old copper to PEX from the crawl space up.
- Outside Duvall, Caleb moved a tub drain and supply lines for a new alcove tub, roughed in the shower valve at the right height and set the tub, leaving it ready for the surround. In November he added new risers off a house's old polybutylene piping for a primary bathroom's toilet, lavatory faucet and deck-mounted soaking tub filler.
- In Sammamish, PJ and Alex plumbed a bathroom remodel over several visits, a job the homeowner reviewed: read the Sammamish remodel story. On the kitchen side, see our kitchen plumbing work in Ballard and the Posi-Temp shower valve replacement in Woodinville.
Bathroom Remodel Plumbing
Whether you're updating a guest bath or rebuilding a master bathroom, we handle:
- Shower and tub rough-in, including drop-in, alcove and freestanding tubs and deck-mounted fillers
- Tub-to-shower conversions, including resizing an undersized drain
- Walk-in showers with one or more control valves
- Double vanity supply and drain stub-outs
- Toilet relocation and wall-hung toilets on in-wall carriers
- Bidet seat water and power planning
- New water lines in PEX, stubbed out in copper where it shows
- Customer-supplied valves and fixtures, roughed in and trimmed out
Kitchen Remodel Plumbing
A kitchen remodel often moves the plumbing more than a bathroom does. We handle:
- Sink relocation, including peninsula-to-island moves
- Island venting with an air admittance valve where a vent pipe can't reach
- Dishwasher and disposal hookups
- Refrigerator water lines in a recessed wall box
- Gas line relocation for a new range or cooktop
- Pot fillers and filtered water faucets
Why Hire a Plumber Early in a Remodel
The drain decides the layout
Water lines bend; drains need fall. Where a new shower, island sink or toilet can go depends on how a drain of the right size can reach the main line, as the Kirkland tub-to-shower conversion showed. A plumber at the planning stage saves redrawing later.
Venting is easy to get wrong
Drains need air to flow. An island sink with no wall behind it needs either a loop vent or an air admittance valve, and getting it wrong means slow drains, gurgling and sewer smells under new cabinets.
Inspections happen before the walls close
Rough-in plumbing is inspected with the walls open. If it is not ready, the drywall and tile wait, and so does everyone else.
Leaks are expensive after the tile is in
Every rough-in we do is put on test before it is covered, because a leak found behind new tile costs the tile.
Our Remodel Process
- Walk-through: we look at the room and the plans and agree who supplies the valves, fixtures and trim
- Written scope: a clear estimate for rough-in and trim-out, with exclusions spelled out
- Rough-in: drains, vents and water lines installed with the walls and floor open
- Test and inspection: the system goes on test and the rough-in is inspected before anything is covered
- Trim-out: valves trimmed, fixtures set and connected once the finishes are done
- Final test: every fixture run and checked for leaks
Frequently Asked Questions
How much does bathroom remodel plumbing cost?
On our 2026 Eastside invoices, the rough-in and trim-out for one bathroom, with a shower or tub, new drain and water lines and customer-supplied valves, ran about $4,000 to $5,000 before tax. A bathroom built around a wall-hung toilet on an in-wall carrier, with a bidet seat and a three-function shower, topped $10,000.
The price moves with how far the drains have to go, how many valves and fixtures there are, and whether old piping like polybutylene or galvanized has to be tied into or replaced.
When should I bring a plumber into my remodel?
Before demolition, or at least before the layout is final. The drain route decides where a shower, tub or island sink can go, and the plumber needs the room open and the customer-supplied valves on site before rough-in day. On the Kirkland master bath, settling the second valve's orientation on the spot saved a later move.
Can I supply my own shower valves and fixtures?
Yes. On the Kirkland master bath the homeowner supplied the tub valve, deck filler and both shower valves, and we roughed them in. They need to be on site before rough-in starts, and the manufacturer's warranty covers those parts, not ours. Tell us the brand and model when you book.
Do I need a permit for remodel plumbing?
Yes. Adding or moving drains, vents or water lines needs a plumbing permit in every jurisdiction we work in, from the city or, in unincorporated King County, Seattle and Clyde Hill, from Public Health. We pull it and the rough-in is inspected before the walls close.
Can you move my kitchen sink to an island?
Usually yes, if the drain can reach the island with enough fall. With the subfloor open we run new PEX and ABS to the island and vent it with an air admittance valve in the cabinet, as PJ and Alexander did near downtown Kirkland in October. A slab floor makes it harder, but not impossible.
Do you work with general contractors?
Yes. Most of our remodel plumbing is coordinated with a general contractor or a homeowner's own crew. Our written scope says exactly what we do and what the other trades do, and when we need the room, so the framers, tile setters and cabinet installers arrive in the right order.
Licensed & Insured
Lighthouse Plumbing is a fully licensed, bonded and insured Washington plumbing contractor, license **LIGHTP*762K2**. We pull the plumbing permits for remodel work and schedule the inspections. More detail is on our licensing and insurance page.

Plan Your Remodel With Us
Planning a bathroom or kitchen remodel in King County? Call us early, before the layout is final, and we will walk the room with you.
More: repiping services · toilet installation · faucet services · gas line services · toilet installation in Kirkland · plumbing in Kirkland